>

PROJECT ACCOMPLISHED

RGT is in survey field for more than 04 years experience. Since inception, RGT Surveys is proved to be quite successful in bagging prestigious projects from our prestigious clients and we are able to complete more than 2000 km of linear projects which include National Highway, State Highway, Route Survey for Water supply and sewerage schemes, Pipeline, Powerlines, Conveyor, Canals etc. and Non- Linear Projects such as command area, property survey etc. exceeding 30,000 Acres. With our work ethic combined with teamwork and trust, we are quite confident that we can continue to provide our services, which shall exceed our customer’s expectations.

SOME OF OUR KEY PROJECTS EXECUTED

S. No.  Project  Scope of Work  Client  Owner  Location 
1. DPR for ERM (Expansion Renovation & Modernisation) for a) Torlow Reservoir Irrigation Scheme & b) Putungra Reservoir Irrigation Scheme. • X- Sectional survey of existing canals (52 Kms).
• Grid Survey of command area (5700 Hectare).
• As built of existing Structures.
Lahmeyer International India (Pvt.) Ltd. Gurgaon. & Hydel Construction, Kangra, H.P Waterways Division, Chaibasa under WRD Department of Government of Jharkhand Manjhari Block, Chaibasa, Jharkhand
2. Construction, Rehabilation and two laning with Paved shoulders of Giridih-Jamua-Sarwan Road in the state of Jharkhand ( 45.15 Km) • Ground Control Point using DGPS
• Traversing
• OGL
• Topo Survey
• Centre Line Skate out
Contractor - GKCPL, Hyderabad ; Consultant - Euroestudios S.L In JV with Rodic Consultants Pvt. Ltd. State Highway Authority of Jharkhand (SHAJ), Project sponsored by Asian Development Bank (ADB) Saran-Jamua-Giridih, Jharkhand.
3. Identification & demarcation of forest boundaries by DGPS/ ETS Survey under various forest divisions in the state of Jharkhand Carrying out ETS Survey in GPS Shadow area at Gomia, under Bokaro Forest Division. Cyber Swift, Kolkata Department of Forest, Environment & Climate change, Jharkhand Goverment Gomia, Bokaro Forest Division, Jharkhand
4. DPR for ERM (Expansion Renovation & Modernisation) for a) Fulwara Reservoir Irrigation Scheme & b) Kawaldag Reservoir Irrigation Scheme. • Cross Sectional survey of existing canals (22 Kms).
• As built of existing Structures.
Lahmeyer International India (Pvt.) Ltd. Gurgaon. & Hydel Construction, Kangra, H.P Waterways Division,Garhwa under WRD Department of Government of Jharkhand Garhwa, Jharkhand
5. Detailed Project report and quality management for proposed “Plastic Park” at Devipur, Deoghar, Jharkhand. Topographical Survey of Plastic Park, (Area 159.47 Acre) Ernst & Young LLP And The Creator Consultant, Ranchi Jharkhand Industrial and Infrastructure Development Corporation (JIIDCO) Devipur, Deoghar, Jharkhand
6. Topographical Survey including as-built of existing structure of the University Topographical Survey including as-built of existing structure of the University The Creator Consultant, Ranchi Vinoba Bhawe University, Hazaribagh Hazaribagh, Jharkhand
7. Topographical Survey of Indian Statistical Institute for building namely a) Rose Villa b) Upper Farm House and c) Lower Farm House, covering an area of approximately 60 Acres Topographical Survey of Indian Statistical Institute covering an area of approx. 60 Acres Indian Statistical Institute, Giridih Indian Statistical Institute, Government of India Giridih, Jharkhand
8. DPR for Construction of Helipad and Reception Building at Parashnath, Giridih, Jharkhand Topographical Survey of Parashnath Mountain for the construction of Helipad and reception Building at MSL 1312 m The Creator Consultant, Ranchi Building Construction Division, Giridih, Jharkhand Giridih, Jharkhand
9. Widening and Strengthning of road at Chatro - a) Chotaki Kharagdiha to Mirzaganj road (17.97 Km) b) Link 1, Nawadih to Gondalitand (6.30 Km) c) Link 2, Mahatotand to Chatro ( 9.31 Km) Survey, Preparation of LS, CS with quantity calculation JNP Infra Pvt. Ltd, Raniganj Road Construction Department, Government of Jharkhand Giridih, Jharkhand
10. Widening and Strengthing of Kowar-Koderma Road from K.M 0+000 to 37+200 Survey, Preparation of LS, CS with quantity calculation Contractor RKS, Ranchi PWD, Giridih Giridih, Jharkhand
11. Alignment Survey for proposed Oil Pipeline across Kiul River, at Lakhisarai, Bihar Alignment Survey for proposed Oil Pipeline across Kiul River, at Lakhisarai, Bihar Nandani Impex Pvt. Ltd. Indian Oil Company (IOC) Lakhisarai, Bihar
12. Survey of Proposed Bridge across Barakar River at Giridih. Alignment Survey, LS/CS on upstream and downstream upto 1 km Ranchi Design, Ranchi Special Division, Government of Jharkhand Dhanbad, Jharkhand
13. Widening and Strengthing of road from NH-114A to Parashnath Hill foot ( 4.1 Km Survey, Preparation of LS, CS with quantity calculation Panchan Kumar Mishra Contractor, Deoghar PWD, Giridih Madhuban, Jharkhand
14. Widening and Strengthing of Giridih-Jamua Road (27.25 Km) Survey, Preparation of LS, CS with quantity calculation as per design PWD, Giridih PWD, Giridih Jamua, Jharkhand
15. Topographical Survey including as-built of existing structure in the premises of Giridih Collectorate for beautification work proposal. Topographical Survey including as-built of existing structure in the premises of Giridih Collectorate for beautification work proposal. Building Construction Division, Giridih, Jharkhand Government of Jharkhand Giridih, Jharkhand
16. Topographical Survey and Alignment Survey of existing canal for further study. Topographical Survey and Alignment Survey of existing canal for further study. VD Surveyors Irrigation Department, Pradip, Odisha Pradip, Odisha
17. Survey of Proposed District Level Football Stadium at Pakur Topographical/ Contour Survey and Skateout/Layout of Football Stadium. The Creator Consultant, Ranchi Government of Jharkhand Pakur, Jharkhand
18. Construction of the Over Bridge under ECL Command Area, Raj Mahal As-Built Survey and verification of Road over Bridge under ECL Command Area, RajMahal ABC Construction Contractor, Rites Consultant ECL Command Rajmahal, Jharkhand
19. Proposal for Forest Clearance of Bus Stand and Parking facility at Madhuban • DGPS Survey.
• Preparation of Geo-Referenced digital shape file in ArcGIS.
• Geo-Reffering of Topo Sheet.
• Digitization of village maps.
• Polygon creation in KML file using google earth.
Rural Work Department (RWD) Tourism Department Jharkhand Madhuban, Jharkhand
20. Proposal for Forest Clearance of Helipad and Reception Building at Parashnath, Giridih, Jharkhand • DGPS Survey.
• Preparation of Geo-Referenced digital shape file in ArcGIS.
• Geo-Reffering of Topo Sheet.
• Digitization of village maps.
• Polygon creation in KML file using google earth.
Building Construction Division, Giridih, Jharkhand Civil Aviation Department, Ranchi Madhuban, Jharkhand
21. DPR preparation of PMGSY roads at different strecth of 25.35 Km Survey, Preparation of LS, CS with quantity calculation Excellent Grapher Surveying Company, Agra Rural Work Department (RWD) Chakai,Jammui, Bihar
22. Development of Jheel Resturant at Tillaya Dam, Jharkhand, Area of 15.0 Acre Topographical Survey including as-built of existing structure. The Creator Consultant, Ranchi Jharkhand Tourism Department Tillaya Dam, Jharkhand
23. Topographical Survey and Alignment Survey of existing and under construction canal for Earthwork Quantity Estimation. Topographical Survey and Alignment Survey of existing and under construction canal for Earthwork Quantity Estimation. Contractor Irrigation Department, Konar Canal Project, Dumri Dumri, Jharkhand